When a Spec Template is added to a new Work Plan, CDM copies selected template values into a draft Work Item.
Fields Copied Into Work Items
CDM copies:
- Template Description to Work Item Description.
- Template Detail to Work Item Memo.
- Spec Division Number to Work Item Division Number.
- Spec Division Name to Work Item Division Name.
- Unit to estimated measurement unit.
- Cost Per Unit to estimated cost per unit.
- Base Rate to base rate.
- Instructional Spec flag to the work item.
- Template reference to the work item.
Fields Not Supplied by the Template
The user still needs to review or enter job-specific information such as:
- Quantity / units.
- Final unit cost, if the default does not apply.
- Project-specific detail text.
- Contractor assignment.
- Accepted bid values.
- Change orders.